BREEAM environmental performance
BREEAM (BRE Environmental Assessment Method) is the leading and most widely used environmental assessment method for buildings. It sets the standard for best practice in sustainable design and has become the measure used to describe a building's environmental performance.
The £9m redevelopment of MOSI's Great Western Warehouse is expected to achieve a BREEAM 'Very Good' rating, with a score of 56.36%, as the table of statistics below shows. This information can also be found in the downloads section on the right hand side of the page.
|
The key innovative and
|
As a Grade II Listed Building, the key to the project has been to retain as much of the existing building and its character as possible to minimise the environmental impact of the scheme. The project is also designed using the latest high-efficiency technologies for mechanical and electrical services. |
|
Innovative Construction |
All waste generated on site is to be recycled, using a combination of separation on site and separation by the Waste Management Contractor. Temporary hoardings between working areas and galleries are to be constructed to limit noise transfer and ensure the comfort of visitors. |
|
Basic Building Cost - £/ m² |
£2,324,782.08 (£/m² TBC) |
|
Services Costs - £/ m² |
£1,902,775.00 (£/m² TBC) |
|
External Works - £/ m² |
£112,503.07 (£/m² TBC) |
|
Lift Costs - £/ m² |
£169,427.85 (£/m² TBC) |
|
Preliminaries |
£241,735.00 (£/m² TBC) |
|
Gross floor area - m² |
Existing:- 13 045 m² |
|
Total area of site - hectares |
Overall Site:- 2.4 Hectares |
|
Function areas and |
Exhibition:- 3926 m² |
|
Area of circulation (m²) |
Existing:- 2075 m² |
|
Area of storage (m²) |
Existing:- 1182 m² |
|
Predicted electricity |
299 kWh/m2 |
|
Predicted fossil fuel |
180 kWh/m2 |
|
Predicted water use |
4.29m3/person/year |